Navigate Up
Sign In
  • عربي
  • ||
  • Sitemap
  • ||
  • Subscribe to our E-mail list
  • ||
  • +974 - 44266666
Building Permit Systems
Ministry of Municipality

​​​​​​​Building Permit Request Automation - User Guide

Public User Guide:

This document is a user guide, giving assistance to the users of Building Permit Request Automation application and guiding them step-by-step on how to use the features and functionality of the application and what actions and procedures to be followed in accordance with the granted privileges, permissions and based on a predefined workflow.

* The service of appointing an engineering consulting office (main-sub) to address government agencies with the specializations specified by them + an appendix to the specialization guide for government agencies

* Approved Maps Permission And Supervisor Search Guide

* Google Authenticator Guide

* Engineering Consulting Offices Procedures Manual

* Data entry screens for building permits and building completion

* Data entry screens for building permits and building completion for services

* Data entry screens for building permits and building completion(Municipality Engineer / Building Permits Complex)

* Refer to Public Using the service of downloading the approved attachments/maps through the AUN app .

* Refer to User Guide.

* Refer to Property Certificate User Guide.

* Refer to Site Preparation User Guide.

* Refer to Porta Cabin User Guide.

* Refer to Add Electricity Meter User Guide.

* Refer to New Online payment process for Building permit.

* Refer to Compliance Procedure Manual.

* Refer to User Guide for the Service of Verifying Intersections of Electricity and Water Lines with the Plot within the Electronic Building Permit System

Refer to Service Guide for Providing Ashghal Data (Road Entrances – Sewerage)

Consultants User Guide:​

This document is a user guide, giving assistance to the users of Building Permit Request Automation application and guiding them step-by-step on how to use the features and functionality of the application and what actions and procedures to be followed in accordance with the granted privileges, permissions and based on a predefined workflow.

* Refer to Consultancy Office User Guide - new update for further details.

* Refer to Completion Certificate User Guide

Please Follow below rules:
* The use of a standard framework for AutoCAD files (A0.dwg + A1.dwg + A2.dwg)
* Provide engineering plans so that each scheme will be in a separate file
* A commitment to providing a way schemes (Model space) and not (Paper Space)

* Refer to Converting Dwg to Dwf.

* Civil Defense اعتماد مخططات المشاريع القائمة
* Consultant Meeting 7th December 2017
* Calculate Fees

​​​

Time: 7 AM to 2 PM

Direct Telephone: +974 - 44347231/2

Telephone: +974 - 44348888

Fax: +974 - 44430239

Mailing Address P.O. Box: 22332

E-mail: bpsupport@mm.gov.qa

Powered by: mm.gov.qa - All copyrights reserved for Ministry of Municipality